Rare 50 x 124.26 (6,213 square foot) Chicago lot for sale! TOO LATE - WE BUILT INSTEAD!

Irving and Narragansett area of Chicago, Illinois in zip code 60634 Owner is selling home and additional lot for development only. This rare 50 foot lot is zoned R2 allowing construction of a home as large as 4,000 square feet (PLUS Basement area [another 1,600+ square feet])!

According to City of Chicago Zoning rules*, the replacement home can be a stunning 35 feet wide (allowing the required 7.5 foot offset on each side of the lot and as long as 69 feet (with a 20 foot set-back as called by current zoning code, although you may set back average of both neighbors house set-back, moving you forward to approximately 15 feet from walk if you prefer a home closer to the walk as the existing home is).

Owner offers the property at $355,000.00 with a stipulation that the existing home be removed (owner will have house torn down at your request as part of sales price).

Small garage to left of red truck has been removed to pave the way for construction equipment to build your dream home!

For more information, contact Michael Kneebone at 773-685-9219
* = as explained to owner when submitting plans for a new home.

Front

Front

Front

Front


The dreded building permit, 5 years in the making, 1 year from final design to issuance. Value? At least $50,000 to get this far!

Front

September 2006 - Trees cleared, ready to demo!

Front

October 23, 2006 - 2 days later, the old house is gone :(

Front

October 30, 2006 - The big dig begins!

Front

October 31, 2006 - Concrete pour for the under-earth footings - will never be seen again...

Front

November 1, 2006 - Concrete pour for the basement walls

Front

November 8, 2006 - Concrete cured, forms removed, large box in front supports front steps...

Front

November 10, 2006 - Plumber comes in and runs new sewer lines.

Front

November 14, 2006 - Sewer and other piping complete, fresh dirt is put back in around foundation.

Front

November 16, 2006 - "Knee" wall is built, sets location for windows, height of basement.

Front

December 1, 2006 - The big wait - precision cut structural steel that will hold up the center of the house is finally delivered...

Front

December 9, 2006 - The big push - full speed ahead! The first floor, floor is put in place.

Front

December 9, 2006 - View from the basement.

Front

December 9, 2006 - Brute force and the first real wall goes up!

Front

December 11, 2006 - Rest of sewer goes in (requires co-ordination with City Sewer and Water and Department of Transportation) and more permits...

Front

December 11, 2006 - Rooms start taking shape and changes, changes, changes. Patrick, our builder, has a great eye for what looked good on a drawing is just not right and changes as needed.

Front

December 13, 2006 - Second floor, floor is installed, up, up, up we go!

Front

December 13, 2006 - Meanwhile, in the basement, the snow has been removed and the floor gets poured.

Front

December 13, 2006

Front

December 15, 2006 - Upstairs hallway

Front

December 16, 2006 - The basement floor is cured, gas pipes, sewer and water is in and the basement is ready for framing.

Front

December 16, 2006 - The roof is underway!

Front

December 16, 2006 - Only a few more days to go for the roof to be on.

Front

December 20, 2006 - Roof work continues...

Front

December 20, 2006 - And all of a sudden, it looks like a real home!

Front

December 23, 2006 - Roof on, shingles get placed on in a few days...

Front

December 23, 2006 - Meanwhile, inside to make vaulted ceilings... takes all sorts of behind the scenes (and walls) detail work.

Front Front

December 23, 2006 - The kitchen and great room are taking shape.

Front

December 27, 2006 - Roof in place, windows are next!

Front

January 3, 2007 - Window installation kicks off (upstairs hallway).

Front

January 3, 2007 - Window installation kicks off.

Front

January 4, 2007 - Doors are in, house is sealed and locked!

Front

January 13, 2007 - Plumbing, heating and electrical are all coming together.

Front

January 13, 2007 - Jacuzzi is delivered.

Front

January 13, 2007 - Future basement fireplace.

Front

March 12, 2007 - Weather finally breaks and brick work starts

Front

March 14, 2007 - Back of house is coming together.

Front

March 14, 2007 - While inside, walls are in and flooring is ready to start...

Front

March 14, 2007 - Slate entry way ready!

Front

March 14, 2007 - An army of people working - master bathroom floor goes in.

Front

March 14, 2007 - Back brick is in.

Front

March 15, 2007 - Arch details and oak flooring is in.

Front

March 15, 2007 - Master shower tile.

Front

March 15, 2007 - While outside, work starts on the front.

Front

March 17, 2007 - Master bath tile work continues

Front

March 17, 2007

Front

March 17, 2007 - Almost!

Front

March 19, 2007 - Brick - done!

Front

March 21, 2007 - Stair case - done!

Front

March 21, 2007 - Front toward kitchen with steps in place...

Front

March 22, 2007 - Scaffolding removed, finally get to see the front.

Front

March 22, 2007 - Time for the steps!

Front

March 23, 2007 - Wow! Doors, doors, doors!

Front

March 23, 2007 - The front is taking shape, next up, the stairs and walks...

Front

March 26, 2007 - Cabinets arrive (Laundry room)

Front

March 26, 2007 - Cabinets arrive (Kitchen)

Front

March 26, 2007 - Fireplace starts taking shape

Front

March 31, 2007 - Trim moves forward with new detail

Front

April 5, 2007 - Kitchen moves forward (some cabinets were broken in shipping and needed to be replaced)

Front

April 10, 2007 - Fireplace trim moves forward with new detail

Front

April 15, 2007 - Painting details all done by hand by Stanley...

Front

April 15, 2007 - Upstairs custom trim is in and painting is completed.

Front

April 22, 2007 - Hand picked (that was a fun outing trying to pick from 100s of pieces of raw granite!) granite counter tops installed.

Front

April 22, 2007 - Fireplace pretty much completed

Front

April 26, 2007 - Let there be light!

Front

May 4, 2007 - Concrete team is back for stairs and walks (day 1 of 2)

Front

May 4, 2007 - Concrete team is back for stairs and walks (day 1 of 2)

Front

May 7, 2007 - Concrete team ditched us a few days, but steps are ready at least...

Front

May 16, 2007 - Garage foundation (4 feet deep to beat Chicago winter ground heaves)

Front

May 16, 2007 - Sidewalks are in - all we need is some grass.

Front

May 20, 2007 - Rest of garage foundation in place and ground compressed and graded.

Front

May 25, 2007 - Appliances start to come in...

Front

June 1, 2007 - With the support concrete poured, garage wall construcion ges underway...

Front

June 6, 2007 - Roof on...

Front

June 9, 2007 - Almost...just need doors and windows

Front

June 12, 2007 - Concrete walks, garage floor and footers for back porce poured.

Front

June 22, 2007 - Back porch almost done!

Front

Meanwhile, inside, carpeting is in and done! (no picture)

June 26, 2007 - Landscaping starts....

Front

June 30, 2007 - Final floor coating completed.

Front

July 2, 2007 - Plants arrive, ground is leveled.

Front

July 7, 2007 - Master bath is completed.

Front

July 9, 2007 - Custom designed fence starts to take shape.

Front

July 10, 2007 - Kitchen done, all that is left is to clean up.

Front

July 10, 2007 - Time for some art work...canvas set-up for painting

Front

Artwork by Stephanie Stanley ArtWorks http://www.stephaniestanley.com

July 14, 2007 - Furniture - getting close now.

Front

July 23, 2007 - Grass arrives...

Front

July 24, 2007 - Fence is getting completed - dreaming of retirement already!

Front

July 28, 2007 - A trial hanging of partially-finished Stephanie Stanley work "Epiphany". This two piece set was started for us in February 2007 long before furniture and rug were choosen. But we did know the basic theme of the room. With that Stephanie did the basic painting. The large creme-colored center is not complete yet, Stephanie was waiting for the final furniture and carpet installation to pull the colors from the room to determine the final colors for the focal point of the painting.

Front

October 2007 - Stephanie is about 70% of the way through the art work for the dining room wall...

Front

December 2007

Front